Case study / Logistics

A delivery board for 42 vehicles

Addis Ababa / 2025

A live delivery board for 42 vehicles, built in 14 weeks. It replaced three spreadsheets, a phone tree, and one planner with a very good memory.

Sector
Logistics and last mile delivery
What we did
Product design, web platform, maps
Built with
Next.js, Node, PostgreSQL, MapLibre
Timeline
14 weeks, 4 people
Delivery board with live routes, vehicle status, and a 38 percent faster planning result
Delivery board / live route view Built for a 1366x768 office monitor
The short version

The logistics team was planning 42 vehicles from three spreadsheets. We built one live board that shows every delivery, every delay, and every promise, so the team can fix a problem before a customer calls. Delivery planning time fell by 38 percent.

The problem

Delivery planning ran on three spreadsheets, a WhatsApp group, and one planner who knew which driver would actually arrive on time. Nobody else could see it. Promised delivery windows lived in people's heads, and a late vehicle was discovered when a customer called.

The team did not need another tracking app. They needed one board that showed the truth at a glance, and a way to flag a problem before it became an angry phone call.

What we changed

We spent two weeks in the delivery office before writing software. We rode along on six routes, mapped 14 steps between sales, delivery planning, drivers, and finance, and found that most delays were decided before a vehicle ever left the yard.

  • One screen for where every vehicle is, what was promised, and what needs attention
  • Driver updates from a phone browser, with no new hardware
  • Automatic arrival time messages when a promised window moved
  • A daily profit report by route, not just a delivery count

What we built

Live delivery board
Driver phone view
Route planning
A list of problems to fix
Arrival time messages for customers
Daily profit report
Who can see and change what
Moving data from spreadsheets

The result

Delivery planning time fell by 38 percent in the first quarter. The team stopped asking where a vehicle was, because the answer was already on the wall. The planner got their mornings back, and finance stopped rebuilding the same delivery report every Friday.

38%Faster delivery planning
11kDeliveries a month
60%Less paperwork

“We used to run deliveries from three spreadsheets and a phone tree. The new board shows every vehicle, every delay, and every promised time in one place. By the second week, the team stopped guessing.”

Operations lead Logistics company, Addis Ababa

What happens next

The build included a 60 day support window, a written handover guide, and two training sessions for the delivery team. The client now owns the code, the hosting account, and the roadmap. We still take the call when they want a second opinion.

Your version

Bring us the messy process.

We will map it, price it, and tell you what it takes to replace it.